一区二区三区国产-精品日产一卡2卡三卡4卡乱码-午夜伦yy44880影院-青青国产线免观-香蕉有码在线视频发布-99热这里只有精品免费-榴莲app福引导大全-激情内射日本一区二区三区

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links
亚洲国产美女精品久久久| 日夜夜天天| 欧美色骚婷婷五月天| 9在线9在线婷婷在线国产| 国产婷伊人| 国产高清v无码av| 午夜精品超级污视频在线观看| 丁香六月婷婷| 久久婷婷色| 欧美无人区码卡二卡3卡4免费| 女高潮大叫喷水抽搐| 97在线观视频免费观看| 粉嫩尤物在线456| 久草在视频免费福利| 办公室里呻吟的丰满老师电影| 97人伦影院A片在线观看| 骚骚精品免费看| 日韩精品A片一区二区三区妖精| 亚洲精品国产熟女久久久| 高清国产少女免费观看电视剧 | 久久婷婷成人综合色怡春院| 五月天成人网在线观看| 五月婷婷官网色| 免费的精品一区二区三区A片| 校园春色性| 中文字幕熟女人妻佐佐木明| 国产午夜亚洲精品| 99热久久精里都是精品6软件介绍| 久久精品视频在这里16| 99天堂网|